Case Study – Campbell’s

cs-header-camp

Campbell Canada has a large manufacturing facility in Etobicoke, ON. They were running 400w metal halide high bays in their production areas, as well as other metal halide fixtures in exterior areas. Due to high energy bills, maintenance costs, and decreasing light levels, Campbell’s made the switch to EnerGreen LED products.

cs-camp-1

In their production facility, Campbell’s installed EnerGreen’s 150w LED high bay fixture. Overall for the whole facility, Campbell’s experienced a 64% energy reduction, with a 160.5 kilowatt reduction. They were also eligible for a rebate through the saveONenergy retrofit program, which accounted for roughly 20% of total project costs.

cs-camp-2